Lists of the best cabinet manufacturers rank brands. A developer needs something different: a way to judge which supplier will deliver the right cabinets to a particular project, on the schedule, at a landed cost that holds. This page sets out the criteria that matter on a multifamily job and compares the four kinds of supplier against them, including where Cabo is strong and where another option may suit you better.
Eight criteria that separate cabinet suppliers on a multifamily job
- Volume quoting. Does the supplier price per unit type and hold the price across the building?
- Custom to your plans. Can it build to your cabinet schedule and unit layouts, or only sell a catalogue?
- Consistency. Will the finish and colour match across every unit and every phase?
- Production window. Is it in writing, and what starts the clock?
- Delivery plan. Can deliveries be matched to buildings or floors, to the site or a warehouse?
- Compliance. Are TSCA Title VI and CARB Phase 2 documents available for the product scope?
- Claims and replacements. How fast are damaged or short items replaced?
- One point of contact. Who owns the package from quote to final delivery?
Four supplier types, compared
| Criterion | US domestic manufacturer | Package supplier or distributor | Asian import | Cabo, factory direct from Mexico |
|---|---|---|---|---|
| Volume quoting | Yes, at large accounts | Yes | Yes, through an importer | Yes, per unit type |
| Custom to your plans | Often limited to standard lines | Depends on the source factory | Possible, with slow sample rounds | Built to your schedule and spec |
| Production window | Depends on backlog | Depends on the source factory | Depends on the factory and holiday calendar | Typically four to five weeks after a confirmed deposit |
| Transit to site | Short | Depends on the source | Long ocean route | Short route from Mexico, confirmed per destination in the quote |
| Price layers | Manufacturer | Manufacturer plus supplier margin | Factory, importer, distributor | Factory direct |
| Replacements | Fast | Depends on the source | Slow | Produced and shipped from nearby |
| Installation | Sometimes | Sometimes | No | No; supply and delivery only |
Where Cabo is the strong choice
- Custom packages built to your plans rather than a stock catalogue
- Projects at volume: apartment buildings, build to rent, student housing and hospitality
- Building supply companies and importers who want cabinets under their own brand (see private label cabinet manufacturing)
- Buyers who have struggled with long ocean routes and want a nearby factory they can visit
Where another option may suit you better
- A single house or a handful of kitchens: a local shop or dealer is the right channel
- You need installation included in the cabinet contract: Cabo supplies only
- You want countertops and sinks from the same supplier: Cabo supplies cabinets, vanities and closet systems only
How to run the comparison
- Send every supplier the same package: unit mix, cabinet schedule, door style, finish, box construction, delivery address and target date.
- Ask each for the landed cost to site, the production window after deposit and the delivery route.
- Line up inclusions and exclusions: hardware, panels, fillers, labelling, freight, customs and delivery.
- Ask for a sample or mockup unit from the finalists.
- Check compliance documents and claims terms before you sign.
- Visit the factory if the package is large. Cabo arranges tours of the Merida factory by appointment.
For the schedule side of the decision, read Mexico versus China cabinet lead times. For a project of a particular size, read where to source cabinets for a 200 unit apartment project.