Where to source cabinets for a 200 unit apartment project

Source cabinets for a 200 unit apartment project from a supplier that sells at project volume, quotes per unit type and shows the full landed cost to your site. Cabo Cabinet Group supplies 200 unit packages of kitchen cabinets, vanities and closets factory direct from a partner factory near Merida, Mexico, with production typically four to five weeks after a confirmed deposit.

What a 200 unit project needs from a cabinet supplier

At 200 units you are past the point where a local cabinet shop or a big box account makes sense, but you may not be large enough to command attention from the biggest national manufacturers. You need a supplier that will:

  • Quote per unit type and hold that price across the whole building
  • Keep one specification, one finish and one colour across every unit
  • Commit to a production window you can put in the schedule
  • Deliver to the site or your warehouse on dates that match the build
  • Answer the phone when a box arrives damaged or a cabinet is short

The four places to source a 200 unit package

SourceWhere it fitsWhat to watch
US domestic volume manufacturerShort transit, familiar specsPrice and backlog when the market is busy
Multifamily package supplier or distributorOne contact for cabinets and often other finishesA margin layer between you and the factory; ask where the cabinets are made
Asian factory through an importerLow factory price on standard linesLong ocean transit, holiday closures and fewer chances to correct a problem
Factory direct from Mexico (Cabo)Custom packages at volume with shorter transit to the USLock the spec early so the production window holds

Whichever you choose, compare quotes on the same basis: the full landed cost to your site for the same scope, the production window after deposit, and the delivery route.

How Cabo plans a 200 unit package

  1. Send the plans. Unit mix, cabinet schedule or plans, door style, finish and target on site date.
  2. Quote per unit type. Cabo prices each unit type and shows the landed cost to your site, the production window and the delivery route.
  3. Approve the spec. New doors, finishes or cabinets get a sample for your approval before production.
  4. Production. Typically four to five weeks after the deposit is confirmed.
  5. Delivery. To the job site or your warehouse, on the plan agreed in the quote. Your installer takes it from there.

Planning examples for 200 units

The examples below show how three common 200 unit project shapes are scoped. They are planning examples, not past projects, and carry no prices or dates. Cabo's own project records will be added here once clients have approved them.

Planning example, not a past project

Garden style community, 200 units in eight buildings

Four unit types repeat across eight walk up buildings. The package is quoted per unit type, with kitchens, one or two vanities per unit and closet systems. The buyer asks for releases by building so cabinets arrive as each building is dried in, not all at once on a site with little storage.

Planning example, not a past project

Mid rise over retail, 200 units in one building

Six unit types stacked over a podium. Storage on site is limited and the hoist schedule is tight, so the buyer delivers to a nearby warehouse and stages floors from there. Cabinet labelling and the delivery sequence are agreed in the quote.

Planning example, not a past project

Build to rent cottages, 200 homes over three phases

Two or three floor plans repeat across phases. Because the plans repeat, the buyer asks Cabo whether a standing program for the remaining phases makes sense, so later phases reorder a spec that is already approved.

Questions to ask any supplier before you sign

  • Where exactly are the cabinets made, and can we visit?
  • What is the production window after deposit, and what starts the clock?
  • What route will the cabinets take to our site, and who handles customs?
  • What compliance documents come with the order? (See our CARB Phase 2 guide.)
  • What happens when a cabinet arrives damaged or short?

For the per unit view of a bulk order, read bulk kitchen cabinets for apartment buildings. For the schedule question, read Mexico versus China cabinet lead times.

Questions buyers ask

Where should I source cabinets for a 200 unit apartment project?

From a supplier that sells at project volume and quotes per unit type: a domestic volume manufacturer, a multifamily package supplier, an Asian factory through an importer, or a factory direct supplier in Mexico such as Cabo Cabinet Group. Compare them on landed cost, production time, delivery route and who manages problems.

How long does production take for 200 units?

At Cabo, production is typically four to five weeks after a confirmed deposit, with sample approval first for new products. Delivery to your site is confirmed per destination in the quote.

Can cabinets be delivered building by building?

Ask Cabo whether releases matched to each building are available for your project. The delivery plan is confirmed in the quote.

What drives the cost of a 200 unit cabinet package?

Unit mix, cabinet count per unit, door style, finish, box construction, hardware and the delivery address. Compare full landed cost to site, not factory price.

Does Cabo install?

No. Cabo supplies and delivers. Your installer or contractor installs.