What a 200 unit project needs from a cabinet supplier
At 200 units you are past the point where a local cabinet shop or a big box account makes sense, but you may not be large enough to command attention from the biggest national manufacturers. You need a supplier that will:
- Quote per unit type and hold that price across the whole building
- Keep one specification, one finish and one colour across every unit
- Commit to a production window you can put in the schedule
- Deliver to the site or your warehouse on dates that match the build
- Answer the phone when a box arrives damaged or a cabinet is short
The four places to source a 200 unit package
| Source | Where it fits | What to watch |
|---|---|---|
| US domestic volume manufacturer | Short transit, familiar specs | Price and backlog when the market is busy |
| Multifamily package supplier or distributor | One contact for cabinets and often other finishes | A margin layer between you and the factory; ask where the cabinets are made |
| Asian factory through an importer | Low factory price on standard lines | Long ocean transit, holiday closures and fewer chances to correct a problem |
| Factory direct from Mexico (Cabo) | Custom packages at volume with shorter transit to the US | Lock the spec early so the production window holds |
Whichever you choose, compare quotes on the same basis: the full landed cost to your site for the same scope, the production window after deposit, and the delivery route.
How Cabo plans a 200 unit package
- Send the plans. Unit mix, cabinet schedule or plans, door style, finish and target on site date.
- Quote per unit type. Cabo prices each unit type and shows the landed cost to your site, the production window and the delivery route.
- Approve the spec. New doors, finishes or cabinets get a sample for your approval before production.
- Production. Typically four to five weeks after the deposit is confirmed.
- Delivery. To the job site or your warehouse, on the plan agreed in the quote. Your installer takes it from there.
Planning examples for 200 units
The examples below show how three common 200 unit project shapes are scoped. They are planning examples, not past projects, and carry no prices or dates. Cabo's own project records will be added here once clients have approved them.
Planning example, not a past project
Garden style community, 200 units in eight buildings
Four unit types repeat across eight walk up buildings. The package is quoted per unit type, with kitchens, one or two vanities per unit and closet systems. The buyer asks for releases by building so cabinets arrive as each building is dried in, not all at once on a site with little storage.
Planning example, not a past project
Mid rise over retail, 200 units in one building
Six unit types stacked over a podium. Storage on site is limited and the hoist schedule is tight, so the buyer delivers to a nearby warehouse and stages floors from there. Cabinet labelling and the delivery sequence are agreed in the quote.
Planning example, not a past project
Build to rent cottages, 200 homes over three phases
Two or three floor plans repeat across phases. Because the plans repeat, the buyer asks Cabo whether a standing program for the remaining phases makes sense, so later phases reorder a spec that is already approved.
Questions to ask any supplier before you sign
- Where exactly are the cabinets made, and can we visit?
- What is the production window after deposit, and what starts the clock?
- What route will the cabinets take to our site, and who handles customs?
- What compliance documents come with the order? (See our CARB Phase 2 guide.)
- What happens when a cabinet arrives damaged or short?
For the per unit view of a bulk order, read bulk kitchen cabinets for apartment buildings. For the schedule question, read Mexico versus China cabinet lead times.